Design, Performance, and Cost Optimization of a 10.2 kWp Grid-Tied Hybrid Photovoltaic System in Owerri, Nigeria
This study presents the design and techno-economic optimization of a 10.2 kWp grid-tied
hybrid photovoltaic (PV) system for residential applications in Owerri, Nigeria. The objective
is to develop a reliable and cost-effective solar power solution capable of mitigating
dependence on the unstable national grid. Household energy demand was estimated based on
the daily consumption patterns of common appliances and their average operating hours. Using
analytical design methods, appropriate PV, inverter, and battery capacities were selected and
optimized to enhance overall system efficiency. The final configuration comprises twenty 510
W monocrystalline PV modules (10.2 kWp total capacity) coupled with a 10 kW hybrid
inverter, yielding a DC/AC ratio of approximately 1.02. Under typical meteorological
conditions in Owerri, the optimized array is projected to generate about 36.72 kWh per day.
Economic analysis, based on a capital cost of N6.6 million, annual maintenance of N66,000, a
20-year lifetime, and a 7% discount rate, indicates a levelized cost of electricity (LCOE) of
approximately N30.5 /kWh and a simple payback period of 7.5 years. The results demonstrate
that with realistic load estimation and properly matched components, small-scale PV systems
can offer a technically feasible and economically sustainable alternative to grid electricity in
Nigeria’s residential sector.